The most significant projects
Construction project (PZI) of roads in the work zone at kp 6069/42 in the municipality of Odžaci, JP Construction Directorate Odžaci - 2015.
Project for a building permit (PGD) for a road in the work zone at kp 6069/42 in the municipality of Odžaci, JP Construction Directorate Odžaci - 2015.
Construction project (PZI) of roads in the work zone at kp 6069/42 in the municipality of Odžaci, JP Construction Directorate Odžaci - 2015.
Technical documentation for the improvement of the intersection of the municipal road Odžaci-Ratkovo and the state road II order number 106 at the entrance to Odžake from the direction of Ratkovo (development of the roundabout solution), JP Construction Directorate Odžaci - 2013.
The main project of the reconstruction of Jurija Gagarina Street in the Central part of Odžaka, JP Construction Directorate Odžaci - 2013.
The main project of the relocation of the state road IA order number 2 (old name M-22) Belgrade-Ljig in the area of exploitation of surface mines of the Kolubara basin L=7,247 km, PD RB "Kolubara" - 2014.
The project of the completed state of the object rehabilitation and extension of the first B row state road number 24 (old designation M-5) from km 789+456.00 to km 808+135.92, JP "ROADS OF SERBIA" / "RATKO MITROVIĆ-NISKOGRADNJA" DOO - 2013.
The main project of the traffic areas of the rehabilitation-tourist resort "Sanitas" in the national park "Fruška gora" in the area of KO Irig, JP "ROADS OF SERBIA" / "RATKO MITROVIĆ-NISKOGRADNJA" DOO - 2013.
The project of the completed state of the object rehabilitation and extension of the first B row state road number 24 (old designation M-5) from km 789+456.00 to km 808+135.92, JP "ROADS OF SERBIA" / "RATKO MITROVIĆ-NISKOGRADNJA" DOO - 2013.
The main project of traffic areas of the rehabilitation-tourist resort "Sanitas" in the national park "Fruška gora" in the area of KO Irig, Selak family foundation "Glasmira - voice of peace" - 2012.
Completion of the main projects of the E-75 and E-80 highway sections Construction project of installations and equipment at the toll ramps: - E80, section 7 Sukovo - Dimitrovgrad (head toll ramp "Dimitrovgrad") - E75 Grabovnica - Grdelica (side toll ramp within the interchange " Grdelica") - E75 Gornje Polje - Caričina Dolina (side toll ramp within the "Predejane" loop) - E75 Vladičin Han - Donji Neradovac (side toll ramp within the "Vranje" loop) - E75 Donji Neradovac - Srpska Kuća (side toll ramp within the interchange "Bujanovac 1") - E75 Srpska Kuća - Levosoje (side toll ramp within the interchange "Bujanovac 2"), "KORIDORI SRBIJE" DOO - 2012.
Design Check and Review of the Main Project for Highway E763: Belgrade - South Adriatic, Sector II: Ljig - Požega, Section 1: Ljig (Donji Banjani) - Boljkovići from km 77+118.23 to km 87+839.45; Section 2: Boljkovići – Takovo from km 87+839.45 to km 100+412.01; Section 3: Takovo - Preljina from km 100+412.01 to km 117+477.02, Total length 40.36 km, "CENTRALNA PUTNA LABORATORIJA" doo Novi Sad - 2012.
The main project of improving the crossing of the state road I-Breda number 24 (old road sign M-5) at km 791+185.64 and Obilićeva Street in Boljevac, JP "Roads of Serbia" / "Ratko Mitrović - niskogradnja" doo - 2012.
Project documentation for the improvement of three intersections of the state road of the first B line number 24 (old designation M-5) and streets in Boljevac, as well as the connection to the AMSS on the section from km 789+456 to km 791+185, as part of the rehabilitation project of the expansion of the main road road M-5, section Boljevac-Selište from km 789+456 to km 807+874, JP "Roads of Serbia" / "Ratko Mitrović - niskogradnja" doo - 2012.
Conceptual solution of the intersection of the Adriatic-Ionian and the Bar-Boljare highway: - in the Strganice area - in the Smokovac area, MUNICIPALITY OF PODGORICA, 2012.
The main project for the sports and recreational tourist complex "Strand" near Bogojevo, JP Construction Directorate Odžaci - 2011.
The main project of Highway E-75, Novi Sad-Belgrade-Niš, section: Batajnica-Dobanovci, Lot A1: interchange "Batajnica" from km 184+738.24 to km 188+680.00, PE "Roads of Serbia" / JV GP " PLANUM" AD & "RATKO MITROVIĆ - Niskogradnja" doo - 2011.
Preliminary design of Highway E-75, Novi Sad-Belgrade-Niš, section: Batajnica-Dobanovci, Lot A1: interchange "Batajnica" from km 184+738.24 to km 188+680.00, PE "Roads of Serbia" / JV GP " PLANUM" AD & "RATKO MITROVIĆ - Niskogradnja" doo - 2011.
The main project for the construction of a parking lot for passenger vehicles on Amos Komenski Square and Školska Street in Novi Sad, PUK "Parking servis" Novi Sad - 2011.
The main project of the E-75 highway, on corridor 10 Section: GP "Kelebija" - interchange "Subotica South", JP "PuteviSrbije" Belgrade - 2010.
The main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 1 from km 1+125.00 to km 16+650.00 (DEVELOPED INTERSECTIONS, REHABILITATION AND NEW CONSTRUCTION) , Ministry of National Investment Plan - 2010.
The main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 2 from km 16+650.00 to km 28+000.00 (NEW CONSTRUCTION), Ministry of National Investment plan - 2010 Main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 3 from km 28+000.00 to km 49+550.00m (NEW CONSTRUCTION), Ministry of National investment plan - 2010
The main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 4 from km 49+550.00 to km 70+250.00 (UNDERGRADED CROSSINGS, REHABILITATION AND NEW CONSTRUCTION) , Ministry of National Investment Plan - 2010.
The main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 5 from km 70+250.00 to km 87+000.00 (UNDERGRADED CROSSINGS, REHABILITATION AND NEW CONSTRUCTION) , Ministry of National Investment Plan - 2010.
Main project of Highway E-75, from GP "Horgoš" to Novi Sad (Corridor 10), from km 1+125 to km 108+000 Section 6 from km 87+000.00 to km 108+000.00 (REHABILITATION AND NEW CONSTRUCTION), Ministry of national investment plan - 2010
Main Project of Highway E-75 (M-22) section: Lot 1.1 from km 108+000.00 to km 120+000.00 Phase II: from km 115+280.00 to km 120+000.00, Energoprojekt – Low-rise construction – 2010. Conceptual design of the highway Bar - Boljare, section Smokovac - Uvač, Government of Montenegro, Traffic Directorate - 2009.
The main project for the construction of two sections of the new (left) lane of the E-75 highway from GP "Horgoš" to Novi Sad, from km 28+000 to km 38+000, from km 98+000 to km 108+000, Ministry of National Investment plan - 2009
The main project of the 1st phase of the UMP: Petlja Hippodrome, UMP de-routes from the crossing over the railway line to the Hippodrome interchange, the connection of the UMP with the existing Vojvode Mišića Boulevard, part of Požeška Street from the Hippodrome interchange to the separation of the ramps that make the connection with Paštrovićeva Street and ramps Požeška-Paštrovićeva and Paštrovićeva-Požeška, with the associated infrastructure in Belgrade, JP "Roads of Serbia" Belgrade - 2009.
Preliminary design of phase Ib of UMP: Požeška Street from the intersection with Vladimira Radovanović Street, to the junction with the Požeška-Paštrovićeva and Paštrovićeva-Požeška ramps, with the associated infrastructure in Belgrade, JP "Roads of Serbia" Belgrade - 2009.
Traffic for the sports center in the settlement of Dr. Ivan Ribar with the associated infrastructure, JP "Roads of Serbia" Belgrade - 2009.
The main project for the improvement of the main road M - 3, Odžaci 2 (Despotovo)–Tower 1 (Bačka Palanka), section: ID 2028 /from junction 2019/ Odžaci 2 (Despotovo), km 20+659, /to junction 2020 / Tower 1 ( BačkaPalanka) km 44+154, L=23,495 km, JP "Roads of Serbia" Belgrade - 2009.
The project of creating technical documentation for enhanced maintenance of the pavement structure of the regional road R-115, section: Bela Crkva - Kaluđerovo, from km 137+356 to km 139+167.50, from km 139+669.86 to km 141+555.50, from km 142+438.00 to km 142+854.00, from km 143+916.35 to km 145+254.90, JP "Roads of Serbia" Belgrade - 2009.
Technical documentation for the reconstruction of the pavement structure of the M-24 highway, from km 243+590 to km 249+590, JP "Roads of Serbia" Belgrade - 2008.
The main project for the improvement (modernization) of the Vrčin toll booth on the E-75 highway, JP "Roads of Serbia" Belgrade - 2008.
The main project for the improvement (modernization) of the Markovac toll booth on the E-75 highway, JP "Roads of Serbia" Belgrade - 2008.
The main project for the improvement (modernization) of the Sirig toll station on the E-75 highway, JP "Roads of Serbia" Belgrade - 2007.
The main project for the improvement (modernization) of the Kolari toll station on the E-75 highway, JP "Roads of Serbia" Belgrade - 2007.
The main project for the improvement (modernization) of the Bubanj Potok toll station on the E-75 highway, JP "Roads of Serbia" Belgrade - 2007.
The main project of the highway E-75 (M-22), section: Lot 1.1 from km 108+000 to km 120+000, phase I from km 108+000 to km 115+280, Energoprojekt – Low-rise construction – 2007.
Preliminary and Main project of the bridge with access roads on the Djetinja River in Užice, JP "Directorate for Construction" - Užice - 2006-2007.
Preliminary design of the E-75 highway, section Feketić - Novi Sad from km 70+400 to km 108+000, JP "Roads of Serbia" Belgrade - 2006.
Technical documentation for strengthening the pavement of the main road M-1.9, section: Vršac-Vatin from km 92+913 (old 89+389) to km 95+924 (old 92+400), JP "Roads of Serbia" Belgrade - 2006.
Technical documentation for strengthening the pavement of the regional road R-124, section: Čenta-Baranda from km 0+000 to km 6+000, JP "Roads of Serbia" Belgrade - 2006.
The main project of pedestrian paths in Kralja Petra Street I from Novi Sad Road to Beogradska Street in Novi Sad, JP "Institute for City Development" - Novi Sad - 2006.
The main project for the construction of roads, sidewalks and storm sewers, the connection between Veljko Petrovića Street and Petrovaradinska Street and Petrovaradinska Street in Sr. Mitrovici, JP Directorate for Construction of the Municipality of Sremska Mitrovica - 2006.
The main rehabilitation project - extension of the main road M-9, section: Maćedonce-Krivača, from km 262+069 to km 287+804, JP "Roads of Serbia" Belgrade - 2006.
Technical documentation of pavement strengthening of regional road R-124, section: Baranda-Opovo from km 7+755 to km 13+344, JP "Roads of Serbia" Belgrade - 2006. The main rehabilitation project - extension of the connection of the M-24 main road with Kačareva, JP "Roads of Serbia" Belgrade - 2006.
The main project of improving the main road, section: Zrenjanin 3 (Vršac) from km 102+800 to km 111+000, JP "Roads of Serbia" Belgrade - 2006.
Conceptual design of the E-75 highway, section GP Horgoš - Feketić from km 1+125 to km 70+400, Republic Directorate for Roads - Belgrade - 2005.
The main rehabilitation project - extension of the main road M-4, section: Loznica - Zavlaka, from km 531+992 to km 557+535, Republic Directorate for Roads - Belgrade - 2005.
The main project for the reconstruction of the road structure R-112, Čoka - Crna Bara, from km 28+930 to km 39+605, Republic Directorate for Roads - Belgrade - 2005.
The main project of road construction reconstruction R-114.1 Bašaid - Torda, L=6954 m, Republic Directorate for Roads - Belgrade - 2005.
The main project of the main road M-22 (E-75), section: Batajnica - Belgrade, section: from km 173+450 to km 176+800, Republic Directorate for Roads - Belgrade - 2004.
The main rehabilitation project - extension of regional road R-123, section: Nova Varoš - Aljinovići, from km 0+000 to km 21+043, Republic Road Directorate - Belgrade - 2004.
The main rehabilitation project - extension of the main road M-8, section: Aljinovići - Sjenica 1, from km 323+832 to km 338+81, Republic Directorate for Roads - Belgrade - 2004.
The main rehabilitation project - extension of the main road M-8, section: Sjenica 1 - DugaPoljana, from km 338+816 to km 362+707, Republic Directorate for Roads - Belgrade - 2004.
Conceptual rehabilitation project - extension of the main road M-22.1, section: Bačka Topola - Feketić, Sector 1: passage through Mali Iđoš from km 73+500 to km 76+600, Sector 2: Lovćenac - Feketić from km 78+904 to km 81 +400, Republic Directorate for Roads - Belgrade - 2004.
The main project of rehabilitation of the pavement structure of the main road M-22.1, passage through Feketić, Republic Directorate for Roads - Belgrade - 2003.
Amendment of the main project for the reconstruction of the pavement structure of the right lane of the E-75 highway, section: Novi Sad - Belgrade from km 112+700 to km 173+450, Republic Directorate for Roads - Belgrade - 2003.
The main project for the rehabilitation of the pavement structure of the main road M-3, border with APV (Bogojevo) - Odžaci 1 from km 0+000 to km 20+363, Republic Directorate for Roads - Belgrade - 2003.