The most significant projects

We have worked on a large number of projects. We have provided numerous consulting services in the field of road engineering. Performed a review of technical documentation and prepared technical control reports for the same. Performed construction control in the capacity of a supervisory body and performed several technical acceptances. The list of significant projects is presented in the following table.

Name of project documentationThe customerYear
Preparation of the report of the commission for technical inspection for 8 traffic connections to SSG state roads owned by NIS adITS Engineering and Technical Services doo2023.
Offer for making changes to the technical solution of the subdivision from km 30+650.07 to km 31+091.90 of the main project of enhanced maintenance of the state road IB-39, section Babušnica – Svođe, from km 25+851 to km 45+385.00, L=19,534km TRACE GROUP HOLD PLC2023.
Creation of project and technical documentation for the construction of a bicycle path in Banja Junaković, SvilojevoMunicipality of Apatin2023.
Carrying out expert supervision on the construction of roads within the Univerexport complex in Sremski Karlovci“MOD ARCHITEKT” LLC2023.
Project of a traffic sign for the extension, reconstruction and adaptation of a business building at 86 Omlandskih Brigada Street in Belgrade“BEOEXPERT” LLC2023.
Traffic area project for a recreational park near SPENS in Novi Sad“DBA” LLC2023.
Traffic road project for warehouse production business building P+1 for Investor Roloplast Mošić in Sremska Mitrovica“PENTA.GE.CO” LTD2023.
Development of a temporary traffic signalization project for the issuance of approval for the temporary reservation of a parking space at 37 Antona Čehova Street in Novi SadDOO PIP NOVI SAD2022.
Development of the Project of the constructed object (PIO) for the project of enhanced maintenance of the state road IIA 114, section: Đurđevo – Šajkaš, km 27+160 – km 31+981, L=4,821 km“VOJVODINAPUT – BAČKAPUT” DOO2022.
Development of the completed object project (PIO) for the works carried out on the section of the Sivac-Stapar road from km 2+110.00 to km 3+970“EXTRA-AUTO TRANSPORT” LLC2022.
Development of traffic and pedestrian communications projects in the “New Spa” zone in the Vrdnik municipality“DBA” LLC2022.
Development of a temporary traffic signalization project with the occupation of public space in Bogdana Šuputa Street in Novi SadINTERIOR JANKOVIĆ2022.
Carrying out expert supervision on the reconstruction of part of the traffic areas and atmospheric sewage within the “Hemofarm” complex at kp 9690/1 KO Vršac, Municipality of VršacHEMOFARM AD Beogradski put bb, 262022.
Carrying out expert supervision for the reconstruction/upgrading of roads inside the former barracks in VršacCelanova Capital doo Vršac2022.
IDP – Conceptual project of the relocation and reconstruction of the state road IB row no. 21 in the zone of influence of the construction of the dam and reservoir of Pambukovica with accompanying infrastructurePublic water company Srbijavode Belgrade2022.
Preparation of technical documentation (projects for notice boards) with obtaining all necessary consents and the decision of the Ministry of Transport for 7 fuel supply stations“EKO SERBIA” AD2022.
Development of a temporary traffic signalization project during the performance of a sports event – a road event (car race on the Brus – Brzeća 2021 mountain tracks) on the state road of the II order number 212.SPORTS CAR AND KARTING ASSOCIATION OF SERBIA2022.
Development of the traffic connection project to the state road for connecting the complex to kp 404/1 KO Milićevo SeloSTEFAN DOO2021.
Traffic road project for the business complex – Supermarket Super Vero at kp 3850/8 in Novi Sad“ELING PLAN” LLC2021.
Creation of a geotechnical study, geodetic foundations and road construction project for the reconstruction – rehabilitation of the streets Dositejeva, Dimitrija Tucovića and part of Zelena Gora, which are part of the state road IB row no. 23. Double carriageway for each direction, length of section L=3.5kmCity of Kraljevo IJP for arranging construction land “Kraljevo”2021.
Carrying out expert supervision on the construction of access roads PP3, PP4, PP5 and PP10 as well as service roads SP1, SP2, SP3, SP4, SP5, SP6 and SP7 SP9, SP10, SP12, all on the territory of the Municipality of Golubac and part of PP10, SP17 and SP18, all on the territory of the Municipality of Kučevo, and all for the construction and exploitation of the “Krivača” Wind Power Plant. The total length of roads L~30km.IVICOM ENERGY DOO Belgrade2021-2023
Traffic and traffic signaling project for the duration of works on state road IB row no. 22, section Raška – Novi Pazar“Novi Pazar – put” doo2021.
PZI – Construction project for the reconstruction of part of traffic areas and storm sewers within the “Hemofarm” complex at kp 9690/1 KO Vršac, Municipality of VršacHEMOFARM AD Beogradski put bb, 262021.
The rehabilitation report with the surface water drainage solution represents a part of the state road IIA order number 181 from km 2+850 to km 4+300, L=1.45kmStrabag doo Belgrade Branch road Čačak2020.
IDR – For the construction of traffic connections of the fuel supply station “Sokolići 1” to the state road IA order number 2 (Highway “Miloš Veliki”)NIS ad Novi Sad 2020.
PGD ​​- Project of temporary traffic signaling during execution for the construction of facilities of the gas distribution network DGM “Popinci” pressure MOP 4barJP “Srbijagas” Novi Sad 2020.
The project of temporary traffic signaling during the construction of the Miljkut flyover“Corridors of Serbia – Roads of Serbia” Belgrade2020.
PIO – Project of temporary traffic signals for the construction of Highway E-75, section: left lane of the section border crossing “Kelebija” – interchange “Subotica south”, SECTOR 1: border crossing “Kelebija” – intersection with state road IB-12 (M-17.1 ), from km 1+320 to km 12+800“Corridors of Serbia – Roads of Serbia” Belgrade2020.
PIO – Road rehabilitation and traffic safety improvement project of state road IB29, section: Aljinovići – Sjenica, from km 39+100 to km 52+900JP “Roads of Serbia” Belgrade2020.
Traffic and traffic signalization project during works on state road IB-15 for the diversion of traffic in Kula due to the complete suspension of traffic, section: Kula (Bačka Topola)-Vrbas (Savino Selo), from km 63+696 to km 73+852JP “Roads of Serbia” Belgrade2020.
IDR – For the construction of a sewage network in the settlements of Mali Crnić, Veliki Crnić and SalakovacMunicipality of Malo Crniće2020.
Project on the found object for a one-way traffic connection for the needs of connecting the fueling station for motor vehicles to the state road IB row number 22, kp 2625 KO Miločaj“TRM MEDIC CO” doo Belgrade2019.
The project on the found object for a two-way traffic connection for the needs of connecting kp 1590/77 KO Bratinac owned by “JIGZ Group” doo Bratinac (Gas station “P&F”), to state road IB order number 34, kp 2929 KO Bubušinac“JIGZ GROUP” doo Bratinac2019.
PGD ​​- Project for a building permit for the construction of a parking lot with accompanying infrastructure in Mikole Kočiša Street in Novi Sad at kp 7663/1 KO Novi Sad IPUK “PARKING SERVICE” Novi Sad2019.
PGD ​​- Project for a building permit for the construction of a traffic connection (inflow/outflow) from kp 697/2 KOVranići to state road IIB order no. 356, Brezna (Srezojevci) – Trbušani at kp 797 KO Vranić“OLI OGI XXI” Vranići, Čačak2019.
PGD ​​- Project for a building permit for the construction of a traffic connection (inflow/outflow) from kp 2847 KO Gornja Rogatica to state road IIA order no. 106, Kljajićevo – Bački Sokolac at kp 2967 KO Gornja Rogatica“SERAGRO” doo Novi Sad2019.
Technical documentation of the improvement of the state road IA – A1 (E-75), Horgoš – Novi Sad (right side), Section from km 1+125 to km 14+800, L=13.68km and from km 27+850 to km 54+ 175, L=26.32km, total L=40.00km, width 11.00m JP “Roads of Serbia” Belgrade 2019.
PGD ​​and PZI – Project for execution of traffic areas with public lighting and accompanying infrastructure in Kralja Petra I Street in Veternik at kp 2169/2, 2167, 1384/1, 1389, 2168/2, 2166, 2165, 521, 2164, 461 , 2163, 419, 391/2, 2162, 1669/2, 377/1, 377/7, 377/8 and 2153/5 KO VeternikCity Administration for Construction Land and Investments, Stevana Branovačko 3, Novi Sad 2018-2020
PZI – Project for the construction of a pedestrian path on kp 7663/1 and part of kp 2398 in Odžaci Construction Directorate Odžaci, Knez Mihajlova 24, 25250 Odžaci2016.
Project of the constructed building, extension (P) and superstructure (Pk) of the “Radost” kindergarten facility in Srbobran (87.23m 2 + 294.00m 2 ), Jovana Popovića Street No. 9, SrbobranMunicipality of Srbobran, Street Trg Slobode 2, Srbobran2014
The project of the completed facility, facility for sports and physical culture (P)-no.1, auxiliary building-no. 2, auxiliary building-no. 3, tribune-no. 4, tribune-no. 5, Ulica Železnička bb, TurijaMunicipality of Srbobran, Street Trg Slobode 2, Srbobran2014
The project of the completed facility, facility for sports and physical culture (changing rooms) (P), Ulice Braće Jockov bb, NadaljMunicipality of Srbobran, Street Trg Slobode 2, Srbobran2014
The project of the constructed building, market and ancillary building within the market space in Srbobran (93.96 m 2 + 1213.08 m 2 ), Popovača venac bb, SrbobranMunicipality of Srbobran, Street Trg Slobode 2, Srbobran2014
The project of the constructed building, residential buildings (P), Ul. Đorđe Bastić no. 2 and no. 4 (66.11 m 2 + 67.03 m 2 ), SrbobranMunicipality of Srbobran, Street Trg Slobode 2, Srbobran2014
Technical documentation of the improvement of the intersection of the municipal road Odžaci-Ratkovo and the state road II order number 106 at the entrance to Odžake from the direction of Ratkovo (development of the roundabout solution)JP Directorate for Construction Odzaci2013
The main project of reconstruction and arrangement of the center of Bački GračacJP Directorate for Construction Odzaci2013
The main project of reconstruction and arrangement of the center of DeronjeJP Directorate for Construction Odzaci2013
The main reconstruction project of Yuri Gagarin Street in the Central part of OdžakJP Directorate for Construction Odzaci2013
The main project for the construction of a motor vehicle recycling facility in RumaPrivate investor2013
The main projects of access roads to technological facilities of the main gas pipeline “South Stream” (L≈15km)Meridian project doo Sombor2013
The main project of the traffic areas of the rehabilitation-tourist resort “Sanitas” in the national park “Fruška gora” in the area of ​​KO IrigPrivate investor2012
The project for the diversion of traffic in the event of the closure of a section of Beogradski Kej Street in Novi SadAZVI SA – Novi Sad branch2012
The main project for the sports and recreational tourist complex “Strand” near BogojevoJP Directorate for Construction Odzaci2011
The main project for the construction of a parking lot for passenger vehicles on Amos Komenski Square and Školska Street in Novi SadPUK “Parking service” Novi Sad2011